Dynamic Bathrooms is a bathroom remodeler in Warmley, fitting full bathrooms, wet rooms and refurbishments. Plumbing and tiling in Warmley are covered by the same team, so there is one point of contact throughout.
Home > Locations > Warmley
Our Services in Warmley
Bathroom remodeler work in Warmley covers installations, refurbishments, wet rooms, bathroom design and conversions both ways. Design is where money gets saved, because changing a drawing costs nothing and changing a tiled wall costs plenty. We measure the room and only draw layouts that can actually be built.
As a plumber in Warmley we handle leaks, taps, radiator installation, unvented cylinder work and power flushing, along with urgent call outs within our opening hours. A joint that has been weeping quietly for months is a common cause when a pipe finally lets go, so we check the rest of the run after fixing it.

Tile contractor work in Warmley covers wall tiling, floor tiling, shower panel installation, LVT flooring, kitchen splashbacks and regrouting. Panels suit a household that cannot lose the bathroom for a week, since a shower area can usually be panelled and back in use far quicker than a full retile.
Warmley sits between Kingswood, Oldland Common and Mangotsfield, and we work across all three. Dynamic Bathrooms has 20 years of experience and holds NVQ Level 2, G3 Unvented and SSSTS certification. Keeping the plumbing and tiling in house means nothing gets lost between separate trades.
NVQ Level 2 qualified bathroom fitters
G3 Unvented registered for cylinder work
SSSTS certified for site safety
20 years fitting bathrooms around Bristol
Plumbing and tiling kept in house
Yes. Warmley is within our regular area. Full bathroom installations, refurbishments, wet rooms and conversions are all covered, with the plumbing and tiling done by the same team. Call and we will arrange a time to come out, measure up and give you a written price.
We take urgent plumbing call outs during our opening hours, 8am to 7pm on weekdays and 10am to 4pm at weekends, and we keep slots back for jobs that cannot wait. Outside those hours, turn the water off at the internal stop tap and call us when we open.
Longer than a standard shower fit, because the floor has to be formed, tanked and tested before any tile goes down. Allow around a week to ten days for most wet rooms. We test the falls with water before tiling rather than finding out afterwards.
t: 07453 144190
Mon: 8am - 7pm
Tue: 8am - 7pm
Wed: 8am - 7pm
Thu: 8am - 7pm
Fri: 8am - 7pm
Sat: 10am - 4pm
Sun: 10am - 4pm
© Copyright 2026. Dynamic Bathrooms. All rights reserved.
Address: 2 Haynes Lane, Bristol, BS16 5FH