Dynamic Bathrooms handles bathroom installation in Staple Hill from strip out to final seal. Plumbing, floor, walls, suite and tiling are all done by one team, working to an order agreed with you before anything comes out.
A full bathroom installation starts with clearing the old room back to the walls and floor. Then comes first fix plumbing, boarding, tanking where needed, tiling, and finally the suite, taps and seals. Every stage has to dry or set before the next, which is why the order matters.
More Information
We plan the job so the toilet goes back as early as it sensibly can. Materials are on site before we start, so no day is lost waiting for a delivery. If it is your only bathroom, tell us at the quote stage and we will build the schedule around that.
What sits under the floor decides a lot. Old pipe runs, rotten boards and uneven joists all show up once the room is stripped. We check the floor before quoting where we can, so the price reflects the room you actually have rather than the one we hoped for.
Bathroom installation is the core of what Dynamic Bathrooms does and has been for 20 years. We are NVQ Level 2 qualified, G3 Unvented registered and SSSTS certified. The same team does the plumbing, the tiling and the fitting, so nothing gets lost between trades and there is one person to call.
NVQ Level 2 qualified bathroom fitters
G3 Unvented registered for cylinder work
SSSTS certified for site safety
20 years fitting bathrooms around Bristol
Plumbing and tiling kept in house
One to two weeks for most full installations. A same layout fit is at the quicker end. Moving the toilet, building up a floor or tanking a wet area pushes it out. We give you a start date and a realistic finish date before the job begins, and tell you early if anything changes.
Yes. Strip out and waste removal are part of the job. The old suite, tiles and flooring go with us and are disposed of properly. We sheet the route in and out and clean up at the end of each day, so the rest of the house stays liveable while we work.
Bathroom electrics are notifiable work, so they are carried out by a qualified electrician and certificated. We coordinate that as part of the installation and build it into the schedule, so the first fix wiring is in before the walls are boarded and tiled.


t: 07453 144190
Mon: 8am - 7pm
Tue: 8am - 7pm
Wed: 8am - 7pm
Thu: 8am - 7pm
Fri: 8am - 7pm
Sat: 10am - 4pm
Sun: 10am - 4pm
© Copyright 2026. Dynamic Bathrooms. All rights reserved.
Address: Flat 2, Pendennis Farm, Haynes Lane, Bristol, BS16 5FH